GOODMAN · HOME SERVICES
Assembly, repairs, carpentry & moving
Assembly, repairs, carpentry & moving
68 services · 4 categoriesThe minimum handyman visit is 200 ₾, including labour. Your selected handyman tasks count towards this amount. Cleaning and waste removal have their own tariffs, without this minimum.Starting labour rates exclude materials and equipment. We confirm the scope and agree the total before work begins.Emergency call-out in your area — from 350 GEL. Call-out and fault resolution. Materials are separate.Diagnostics use the catalog rates and count towards the handyman visit minimum.
Services
Furniture assembly, door adjustment and replacement of small fittings.
21 servicesFollowing the assembly instructions
Cut-outs and connections extra
Misaligned or not closing properly
Following the assembly instructions
For moving or rearranging
Replace the drawer runners
Assemble one simple IKEA item from a complete kit: a small table, cabinet or open shelving unit. Large wardrobes, kitchens, complex mechanisms and wall mounting are separate.
One local kitchen-cabinet repair: secure and adjust a front, hinge or drawer runner. Parts, cabinet-body or worktop replacement and restoration are separate.
Assemble and join two simple furniture modules from a complete kit. Larger systems, fitted furniture, cutting and complex mounting are separate.
Indicative GOODMAN labour rate. One standard flat-pack sliding wardrobe, up to 2 doors; no cutting or moving. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One supplied sofa kit; excludes upholstery and mechanism repairs. Labour only; materials and installed equipment extra.
One mover-hour indoors; heavy items require additional movers. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One cabinet hinge with at least 2 replaced; existing fixing points intact. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One accessible loose joint or fixing; no custom parts. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One simple armchair: remove and replace upholstery; frame repair excluded. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One small table: surface preparation, minor joints and refinishing; no carving. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One standard kitchen measurement visit; design and furniture drawings extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Straight laminate top on fitted cabinets; stone, cut-outs and removal extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. One sink or hob cut-out in particleboard; stone and connections extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. One ready-made front on compatible hinges; manufacture and new fittings extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. One set of water, drain and electrical points moved up to 1 m; chasing and finishing extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. One straight shelf up to 1 m from supplied board: cutting, sanding, assembly; elaborate finish extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One simple shelving unit up to 2×1 m, 4 shelves; no doors or carving. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² of simple framed partition with wood cladding on one side; minimum 10 m². Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² of supplied panels on a level base; minimum 10 m², no complex pattern. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² of straight lining boards on prepared battens; minimum 10 m², no painting. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per linear metre of a supplied straight wood worktop: trimming, fixing and end sealing; no solid-wood fabrication. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One simple straight wooden flight up to 8 steps on prepared supports; railings extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² of accessible clean wood, one protective coat; minimum 10 m², no stripping. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² of wood: light sanding and 2 paint coats; minimum 10 m², no restoration. Labour only; materials and installed equipment extra.
Moving, packing and lifting. Route, access and work details are agreed before estimating.
9 servicesOne mover-hour loading and unloading furniture; vehicle, packing and assembly extra; required crew size agreed. Labour only; materials and installed equipment extra.
One mover-hour rearranging items on one level; heavy items need additional workers. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One packer-hour for ordinary household belongings; boxes, wrap and transport extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One hour of a 2-person crew moving disconnected appliances up to 100 kg on one level; vehicle, connections and stairs extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One hour of a 3-person crew for a safe up to 200 kg over a level floor; special rigging, stairs and vehicle extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One hour of a 3-person crew for an upright piano up to 250 kg on one level; stairs, grand piano and transport extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One hour of a 4-person crew moving prepared equipment up to 400 kg over a level floor; machinery and disconnections extra. Labour only; materials and installed equipment extra.
One loader-hour carrying packed materials upstairs; crew size, floor and access agreed; lift hire extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One hour of a 3-person rigging crew for an agreed operation; equipment hire, crane, vehicle and structural survey extra. Labour only; materials and installed equipment extra.
Sockets, lighting, distribution boards, wiring, diagnostics and equipment connections.
2 servicesAt an existing connection point
Install and test one simple light at an existing connection point. Complex chandelier assembly, new wiring, mounting reinforcement and materials are separate.
Kitchen or bathroom mixer tap
Kitchen or bathroom
A wall-mounted accessory
Plastering, filling, painting, wallpaper, tiling, flooring and plasterboard.
2 servicesStraight installation of click-lock laminate on a level, prepared base, per m². Materials, removal, levelling, skirting, glued flooring, parquet and herringbone layouts are separate.
Furniture, fixings and an agreed list of small tasks in commercial spaces.
3 servicesDiagnostics, repairs and connections for kitchen and household appliances.
3 servicesTo existing connection points
To existing connection points
Clean and apply a new silicone seal along one metre of accessible worktop joint. Thick old-seal removal, swollen-edge repairs and materials are separate.
Indicative GOODMAN labour rate. One kitchen hood and up to 2 m accessible duct to an existing outlet; drilling and cabinet work separate. Labour only; materials and equipment excluded.
Windows, insulated glazing, glass partitions and balcony finishing.
1 serviceIndicative GOODMAN labour rate. Per metre of supplied sill, trimming and fixing to a prepared base; minimum 1 m. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Standard tiles on a prepared splashback; mosaic, outlets and levelling extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Straight engineered-stone worktop on a prepared base; cut-outs and natural stone extra. Labour only; materials, equipment and plant hire extra.
Dismantling structures, diamond cutting and construction waste removal.
1 serviceIndicative GOODMAN labour rate. Straight kitchen run with appliances disconnected; stone and hauling extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Per m² of low open deck: supports, joists and decking on a prepared site; minimum 15 m², no roof or railings. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² plan area of a simple wooden pergola, assembled on prepared supports; minimum 6 m², no roofing or drive. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² projected area of a simple canopy: supplied frame and sheet roofing; minimum 6 m², foundations extra. Labour only; materials and installed equipment extra.
Tell us your preferred day or time window. A specialist's availability is confirmed when discussing your request.
One task or a whole list