GOODMAN · HOME SERVICES
Timber structures, wood finishes, worktops and wood care.
The minimum handyman visit is 200 ₾, including labour. Your selected handyman tasks count towards this amount. Cleaning and waste removal have their own tariffs, without this minimum.Starting labour rates exclude materials and equipment. We confirm the scope and agree the total before work begins.Emergency call-out in your area — from 350 GEL. Call-out and fault resolution. Materials are separate.Diagnostics use the catalog rates and count towards the handyman visit minimum.
Describe the task and include dimensions or the equipment model. Add photos, video and a plan if available. We confirm the scope, specialist availability and quote before work begins.
One task or a whole list
Indicative GOODMAN labour rate. One straight shelf up to 1 m from supplied board: cutting, sanding, assembly; elaborate finish extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One simple shelving unit up to 2×1 m, 4 shelves; no doors or carving. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² of simple framed partition with wood cladding on one side; minimum 10 m². Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² of supplied panels on a level base; minimum 10 m², no complex pattern. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² of straight lining boards on prepared battens; minimum 10 m², no painting. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per linear metre of a supplied straight wood worktop: trimming, fixing and end sealing; no solid-wood fabrication. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One simple straight wooden flight up to 8 steps on prepared supports; railings extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² of accessible clean wood, one protective coat; minimum 10 m², no stripping. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² of wood: light sanding and 2 paint coats; minimum 10 m², no restoration. Labour only; materials and installed equipment extra.
Straight installation of click-lock laminate on a level, prepared base, per m². Materials, removal, levelling, skirting, glued flooring, parquet and herringbone layouts are separate.
Indicative GOODMAN labour rate. Per metre of supplied sill, trimming and fixing to a prepared base; minimum 1 m. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² of low open deck: supports, joists and decking on a prepared site; minimum 15 m², no roof or railings. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² plan area of a simple wooden pergola, assembled on prepared supports; minimum 6 m², no roofing or drive. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² projected area of a simple canopy: supplied frame and sheet roofing; minimum 6 m², foundations extra. Labour only; materials and installed equipment extra.
Tell us your preferred day or time window. A specialist's availability is confirmed when discussing your request.
Before you contact us
An initial estimate uses your tasks and quantities. Materials and any additional work are assessed from photos or on site. We agree the total before work begins.
Enter a preferred day or time window in your request. It is a preference, not a confirmed slot. We will agree on the visit after checking availability.
Describe the task and include dimensions or the equipment model. Add photos, video and a plan if available. We confirm the scope, specialist availability and quote before work begins.
One task or a whole list