GOODMAN · HOME SERVICES
Complete projects, roofing, facades & building work
Complete projects, roofing, facades & building work
124 services · 10 categoriesThe minimum handyman visit is 200 ₾, including labour. Your selected handyman tasks count towards this amount. Cleaning and waste removal have their own tariffs, without this minimum.Starting labour rates exclude materials and equipment. We confirm the scope and agree the total before work begins.Emergency call-out in your area — from 350 GEL. Call-out and fault resolution. Materials are separate.Diagnostics use the catalog rates and count towards the handyman visit minimum.
Services
Residential and commercial renovation. Plan, stages and estimate follow a discussion of the property.
14 servicesIndicative GOODMAN labour rate. Basic apartment renovation with one standard bathroom, preparation, standard services and finishes; furniture and layout changes extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. House interior preparation, services and finishes; facade, roof and grounds extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Basic office finishes with standard electrical/plumbing; IT, ventilation and specialist systems extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Basic shop/commercial refurbishment; process equipment and specialist systems extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. From a basic shell: levelling, standard services and finishes; layout changes extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Major renovation with strip-out, standard service replacement and finishes; structural reconstruction extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Whole-project refresh of sound walls, ceiling and floor; no service replacement or major levelling. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Plaster, screed and basic concealed services; partitions, finishes and fixture installation extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Filling, painting, basic flooring and skirting on prepared bases; rough works extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Roughly 10 m² kitchen refurbishment with finishes and standard point relocation; cabinets, appliances and their installation extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Higher-detail finishes to an existing design; design development and bespoke pieces extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Non-loadbearing internal reconfiguration plus basic major renovation; structural work, design and permits extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. One hour sourcing/purchase coordination from an existing schedule; goods, delivery and unloading extra. Labour only; materials, equipment and plant hire extra.
One month coordinating one standard project; independent oversight and construction labour extra. Labour only; materials, equipment and plant hire extra.
Dismantling structures, diamond cutting and construction waste removal.
14 servicesNon-loadbearing block partition up to 100 mm; concrete, support and hauling extra. Labour only; materials, equipment and plant hire extra.
Removal of floating laminate; screed and hauling extra. Labour only; materials, equipment and plant hire extra.
One ceramic-tile layer; thick backing and hauling extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Light suspended ceiling; concrete, services and hauling extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Straight kitchen run with appliances disconnected; stone and hauling extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. One toilet or basin with water isolated; bath and hauling extra. Labour only; materials, equipment and plant hire extra.
One internal door and frame; windows, concrete and hauling extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. One small cabinet dismantled/carried from ground floor; transport and disposal extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Light frame with prepared access; crane, heavy cutting and hauling extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Simple roof-cover removal; frame, complex facade and hauling extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Exposed isolated pipe or cable; wall opening and utility isolation extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Straight concrete cut up to 100 mm deep; block handling, support and rig hire extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. One hole up to 50 mm diameter/200 mm deep; thick reinforced concrete and rig hire extra. Labour only; materials, equipment and plant hire extra.
Standard straight chase in a non-loadbearing wall; concrete, filling and hauling extra. Labour only; materials, equipment and plant hire extra.
Accessible standard-thickness MMA steel weld; preparation, TIG and mobilisation extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Accessible straight TIG weld; complex geometry, preparation and testing extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Simple steel panel or gate leaf; posts, automation and painting extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Straight simple steel railing; stainless, forged decoration and painting extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Per tread of a straight steel stair frame; cladding, railing and design extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Light rectangular canopy frame; foundations, roof cover and design extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. One steel pipe joint up to 50 mm; isolation, purging and testing extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Simple welded grille with normal access; forged detail and painting extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. One hour fitting, drilling or assembling parts; machine-shop manufacture extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. 100 mm slab on a prepared base with simple mesh; excavation and concrete delivery extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Per tread of a straight concrete flight with formwork; design and cladding extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Simple designed reinforced-concrete wall per face area; earthworks, foundation and drainage extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Simple concrete work: forms,100 kg rebar/m³ and placement; design, pump and complex geometry extra. Labour only; materials, equipment and plant hire extra.
Tying a simple designed cage, base volume 5 t+; welding and lifting extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Straight panel formwork per contact area; hire, curved forms and special propping extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Straight 100 mm non-loadbearing block partition; brick, stone, lintels and plaster extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Local repointing/rebuilding; structural strengthening and facade access extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Preparation/injection of an accessible crack; engineering, resins and pump hire extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Profiled sheet or metal tile on ready battens; standing seam and framing extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Bitumen shingles on a prepared continuous deck; deck and framing extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Membrane installation on a prepared base; falls, insulation and parapet details extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Diagnosis and local repair of one simple detail up to 1 m²; full roof replacement extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Insulation, vapour barrier and membrane in ready rafters; lining extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Straight flashing or ridge with ready access; complex valleys extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. One row of standard snow guards; roof reinforcement extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Straight standard gutter/downpipe with ready access; complex details extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Visual inspection of an accessible roof with photos; opening-up and engineering opinion extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Temporary local sealing of one detail; permanent rebuilding extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Standard plaster on a prepared exterior base; scaffolds and heavy levelling extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Two coats on a prepared facade; preparation and high access extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Insulation, mesh, base and decorative coats; scaffolds and wall repair extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Simple subframe, insulation and light panels; scaffolds, heavy stone and design extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Straight siding on ready battens; insulation, battens and access extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Non-structural render crack; full-elevation paint and scaffolds extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Accessible straight joint with local preparation; rope access extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Local ordinary render/paint restoration; historic ornament and scaffolds extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Simple ready-made lightweight trim; fabrication, heavy elements and scaffolds extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Straight sill flashing on prepared fixing points; high access extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Prepared plinth: plaster, primer and paint; waterproofing and stone extra. Labour only; materials, equipment and plant hire extra.
Foundation strengthening, drainage, perimeter aprons and basement protection.
9 servicesIndicative GOODMAN labour rate. Local reinforced-concrete jacket to an approved design; excavation, design and complex underpinning extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Boards on an exposed level foundation wall; excavation and waterproofing extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. 100 mm concrete apron on a prepared base with falls; excavation and drainage extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Shallow line up to 0.5 m in ordinary soil; deep excavation, wells and plant extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Basement wall-surface repair: preparation, isolation and finish; structural work extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Up to 2 technician hours of setup/checks per day; dehumidifiers, electricity and leak repair extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. One fan with a short duct in an existing opening; drilling and new electrical circuit extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. One pump in an existing sump; new pit, pipe runs and power supply extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. One simple well up to 1×1 m on a prepared base; deep excavation and drainage extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Per m² of low open deck: supports, joists and decking on a prepared site; minimum 15 m², no roof or railings. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² of straight decking on prepared joists; minimum 10 m², base construction extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² of local decking replacement on sound joists; minimum 2 m², structural frame extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² plan area of a simple wooden pergola, assembled on prepared supports; minimum 6 m², no roofing or drive. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² projected area of a simple canopy: supplied frame and sheet roofing; minimum 6 m², foundations extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One supplied manual awning up to 3 m on a sound facade; electrical supply extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² floor area of a simple supplied wooden gazebo with lightweight roof; minimum 6 m², foundation extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per metre of supplied railing up to 1.1 m high on a prepared edge; minimum 3 m, section fabrication extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One outdoor luminaire connected to an existing point; new cable route extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per metre of channel in a prepared sloping trench; minimum 5 m, outlet and excavation extra. Labour only; materials and installed equipment extra.
Outbuildings, paving and outdoor areas. Scope and estimate follow site details.
10 servicesIndicative GOODMAN labour rate. Simple single-storey shed on a prepared site: walls, floor, roof; services and structural foundations extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Simple garage shell on a prepared base; gate, services, design and foundation extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Simple covered outdoor kitchen with basic service points; furniture, appliances and main runs extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Paved area with basic non-combustible detailing; grill, hearth, canopy and services extra. Labour only; materials, equipment and plant hire extra.
Paving blocks with standard base preparation; deep excavation and soil removal extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Straight garden kerb in a prepared trench; heavy road kerbs and excavation extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Level paved parking surface; reinforced sub-base, drainage and canopy extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. One simple prefabricated bench or table; concrete bases and manufacture extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. One small prefabricated play structure; surfacing, concrete footings and design extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Basic slab, rolled sports surface and markings; fencing and exercise equipment extra. Labour only; materials, equipment and plant hire extra.
Façade and installation work at height. Access and work methods depend on the property.
11 servicesIndicative GOODMAN labour rate. One productive hour of height-access mounting with agreed access; anchors, lift and permits extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Straight joint with local preparation; new anchors and complex opening-up extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Routine exterior glass wash with prepared access; deposits, new anchors and plant extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Local preparation/painting on a sound facade; heavy repairs and new anchors extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. One small sign on prepared fixings; electrics, crane and new anchors extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. One light on an existing circuit; new wiring and access anchors extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Mount a standard outdoor unit on prepared brackets; pipe run, refrigerant and crane extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Straight gutter section using height access; new anchors and complex outlets extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. One local roof detail up to 1 m²; full replacement and new safety anchors extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. One small antenna on an existing bracket; cable runs and new access provision extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Net fixing to prepared supports; system design, supports and anchors extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Small facade tiles on a prepared wall; scaffolds, insulation and heavy stone extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Typical roughly 5 m² bathroom: strip-out, services, waterproofing, tile and fixture fitting; layout changes extra. Labour only; materials, equipment and plant hire extra.
Price per trip of the selected truck. We agree the vehicle, waste volume and loading arrangements from your description and photos before dispatch. The standard handyman visit minimum does not apply.
Price per trip of the selected truck. We agree the vehicle, waste volume and loading arrangements from your description and photos before dispatch. The standard handyman visit minimum does not apply.
Price per trip of the selected truck. We agree the vehicle, waste volume and loading arrangements from your description and photos before dispatch. The standard handyman visit minimum does not apply.
Price per trip of the selected truck. We agree the vehicle, waste volume and loading arrangements from your description and photos before dispatch. The standard handyman visit minimum does not apply.
Water protection and insulation of joints, substructures and pipes.
3 servicesIndicative GOODMAN labour rate. Two coats on a prepared base with simple edges; falls and tiling extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Membrane waterproofing on a prepared flat roof; base, insulation and removal extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Applied coating on an exposed prepared wall; excavation and drainage extra. Labour only; materials, equipment and plant hire extra.
Stove and fireplace installation and finishes, chimneys and outdoor cooking hearths.
1 serviceIndicative GOODMAN labour rate. One simple brick barbecue to a supplied plan on a prepared base; canopy and worktop extra. Labour only; materials and installed equipment extra.
Pruning, care and tree removal. Method depends on tree condition and access.
1 serviceIndicative GOODMAN labour rate. One tree up to 8 m: limited pruning of an accessible crown section, up to 4 person-hours; lift and complex lowering extra. Labour only; materials and installed equipment extra.
Façades, paving and outdoor structures. Cleaning method matched to the material.
1 serviceIndicative GOODMAN labour rate. Per m² accessible facade up to 3 m high, routine washing; minimum 30 m², chemicals and elevated access extra. Labour only; materials and installed equipment extra.
Closing entry points, protective screens and damage repair. Measures depend on the property.
2 servicesIndicative GOODMAN labour rate. Per m² bird net in a simple opening up to 3 m high; minimum 10 m², elevated access and complex frame extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per metre of mechanical bird deterrent on accessible eaves up to 3 m; minimum 5 m, electrical systems and droppings cleanup extra. Labour only; materials and installed equipment extra.
Property condition and workmanship checks, measurements and estimates. Inspection scope agreed for your task.
2 servicesOne month of agreed stage checks on one 150–300 m² property; permanent attendance extra. Labour only; materials, equipment and plant hire extra.
Review of one existing estimate with findings; measurement and design creation extra. Labour only; materials, equipment and plant hire extra.
Tell us your preferred day or time window. A specialist's availability is confirmed when discussing your request.
One task or a whole list