GOODMAN · HOME SERVICES
Foundation strengthening, drainage, perimeter aprons and basement protection.
The minimum handyman visit is 200 ₾, including labour. Your selected handyman tasks count towards this amount. Cleaning and waste removal have their own tariffs, without this minimum.Starting labour rates exclude materials and equipment. We confirm the scope and agree the total before work begins.Emergency call-out in your area — from 350 GEL. Call-out and fault resolution. Materials are separate.Diagnostics use the catalog rates and count towards the handyman visit minimum.
Describe the task and include dimensions or the equipment model. Add photos, video and a plan if available. We confirm the scope, specialist availability and quote before work begins.
One task or a whole list
Indicative GOODMAN labour rate. Local reinforced-concrete jacket to an approved design; excavation, design and complex underpinning extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Boards on an exposed level foundation wall; excavation and waterproofing extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. 100 mm concrete apron on a prepared base with falls; excavation and drainage extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Shallow line up to 0.5 m in ordinary soil; deep excavation, wells and plant extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Basement wall-surface repair: preparation, isolation and finish; structural work extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Up to 2 technician hours of setup/checks per day; dehumidifiers, electricity and leak repair extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. One fan with a short duct in an existing opening; drilling and new electrical circuit extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. One pump in an existing sump; new pit, pipe runs and power supply extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. One simple well up to 1×1 m on a prepared base; deep excavation and drainage extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. Applied coating on an exposed prepared wall; excavation and drainage extra. Labour only; materials, equipment and plant hire extra.
Tell us your preferred day or time window. A specialist's availability is confirmed when discussing your request.
Before you contact us
An initial estimate uses your tasks and quantities. Materials and any additional work are assessed from photos or on site. We agree the total before work begins.
Enter a preferred day or time window in your request. It is a preference, not a confirmed slot. We will agree on the visit after checking availability.
Describe the task and include dimensions or the equipment model. Add photos, video and a plan if available. We confirm the scope, specialist availability and quote before work begins.
One task or a whole list