GOODMAN · HOME SERVICES
Complete bathroom and toilet renovation and furniture fitting.
The minimum handyman visit is 200 ₾, including labour. Your selected handyman tasks count towards this amount. Cleaning and waste removal have their own tariffs, without this minimum.Starting labour rates exclude materials and equipment. We confirm the scope and agree the total before work begins.Emergency call-out in your area — from 350 GEL. Call-out and fault resolution. Materials are separate.Diagnostics use the catalog rates and count towards the handyman visit minimum.
Describe the task and include dimensions or the equipment model. Add photos, video and a plan if available. We confirm the scope, specialist availability and quote before work begins.
One task or a whole list
Indicative GOODMAN labour rate. Typical roughly 5 m² bathroom: strip-out, services, waterproofing, tile and fixture fitting; layout changes extra. Labour only; materials, equipment and plant hire extra.
One assembled wall-hung vanity; assembly and sink connections extra. Labour only; materials, equipment and plant hire extra.
Shower system
Kitchen or bathroom
Replace old sealant
Per metre of accessible joint: remove ordinary old silicone, clean and reseal. Deep mould treatment, plumbing disassembly and sealant are separate.
Repair and test one accessible connection or exposed cable section up to 1 m. Hidden-fault tracing, wall chasing, finishing and materials are separate.
Liquid waterproofing on a prepared floor; screed, strip-out and joints extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. One toilet or basin with water isolated; bath and hauling extra. Labour only; materials, equipment and plant hire extra.
One ceramic-tile layer; thick backing and hauling extra. Labour only; materials, equipment and plant hire extra.
Indicative GOODMAN labour rate. One drain in a prepared base with a ready waste outlet; screed, waterproofing and tiles separate. Labour only; materials and equipment excluded.
Indicative GOODMAN labour rate. One concealed support frame on existing outlets; boxing, tiles and toilet bowl installation separate. Labour only; materials and equipment excluded.
Indicative GOODMAN labour rate. Floor-standing bidet on existing water and waste outlets; pipe relocation separate. Labour only; materials and equipment excluded.
Indicative GOODMAN labour rate. Water towel radiator on existing isolatable outlets; riser relocation separate. Labour only; materials and equipment excluded.
Indicative GOODMAN labour rate. One room: fan and short duct up to 2 m to an existing shaft; drilling and new wiring separate. Labour only; materials and equipment excluded.
Indicative GOODMAN labour rate. Lay hydronic loops on prepared mats, area20 m² or more; manifold, insulation, pressure test and screed separate. Labour only; materials and equipment excluded.
Indicative GOODMAN labour rate. Lay electric heating mat on a prepared base, area5 m² or more; screed, tiles and thermostat separate. Labour only; materials and equipment excluded.
Tell us your preferred day or time window. A specialist's availability is confirmed when discussing your request.
Before you contact us
An initial estimate uses your tasks and quantities. Materials and any additional work are assessed from photos or on site. We agree the total before work begins.
Enter a preferred day or time window in your request. It is a preference, not a confirmed slot. We will agree on the visit after checking availability.
Describe the task and include dimensions or the equipment model. Add photos, video and a plan if available. We confirm the scope, specialist availability and quote before work begins.
One task or a whole list