GOODMAN · HOME SERVICES
Boilers, radiators, underfloor heating and system servicing.
The minimum handyman visit is 200 ₾, including labour. Your selected handyman tasks count towards this amount. Cleaning and waste removal have their own tariffs, without this minimum.Starting labour rates exclude materials and equipment. We confirm the scope and agree the total before work begins.Emergency call-out in your area — from 350 GEL. Call-out and fault resolution. Materials are separate.Diagnostics use the catalog rates and count towards the handyman visit minimum.
Describe the task and include dimensions or the equipment model. Add photos, video and a plan if available. We confirm the scope, specialist availability and quote before work begins.
One task or a whole list
Install one wall gas boiler on prepared approved connections; new gas line, flue and permits separate. Labour only; materials and equipment excluded.
Indicative GOODMAN labour rate. One electric boiler up to 12 kW on prepared hydraulic and electrical outlets; new power circuit separate. Labour only; materials and equipment excluded.
Indicative GOODMAN labour rate. Replace one accessible element in a domestic tank up to 100 L with draining and testing; heavy descaling separate. Labour only; materials and equipment excluded.
One wall radiator on ready brackets and isolatable outlets; pipe relocation and whole-building draining separate. Labour only; materials and equipment excluded.
Flush one accessible heating point within a system; chemicals, dismantling and severe blockages separate. Labour only; materials and equipment excluded.
Indicative GOODMAN labour rate. Balance an apartment system up to 5 radiators with working balancing valves; valve replacement separate. Labour only; materials and equipment excluded.
Indicative GOODMAN labour rate. Lay hydronic loops on prepared mats, area20 m² or more; manifold, insulation, pressure test and screed separate. Labour only; materials and equipment excluded.
Indicative GOODMAN labour rate. Install a factory manifold up to 4 loops in a prepared cabinet; custom manifold fabrication separate. Labour only; materials and equipment excluded.
Indicative GOODMAN labour rate. One circulator on existing unions and power; new pipework and large-system draining separate. Labour only; materials and equipment excluded.
Indicative GOODMAN labour rate. One room thermostat on existing cable or compatible wireless controls; new wiring separate. Labour only; materials and equipment excluded.
Indicative GOODMAN labour rate. Basic service of one domestic heat pump up to 12 kW: accessible cleaning and setup; installation, refrigerant and repairs separate. Labour only; materials and equipment excluded.
Indicative GOODMAN labour rate. Pressure-test one domestic system up to 5 radiators or 2 loops; leak repairs separate. Labour only; materials and equipment excluded.
Indicative GOODMAN labour rate. Start up or shut down one system up to 5 radiators: pressure, venting and settings; repairs and antifreeze separate. Labour only; materials and equipment excluded.
Indicative GOODMAN labour rate. One simple electric water-heater fault: thermostat or connection; tank and heating element work separate. Labour only; materials and equipment excluded.
Indicative GOODMAN labour rate. Per metre of modular metal flue with fixings through prepared penetrations; minimum 3 m, roof details extra. Labour only; materials and installed equipment extra.
Tell us your preferred day or time window. A specialist's availability is confirmed when discussing your request.
Before you contact us
An initial estimate uses your tasks and quantities. Materials and any additional work are assessed from photos or on site. We agree the total before work begins.
Enter a preferred day or time window in your request. It is a preference, not a confirmed slot. We will agree on the visit after checking availability.
Describe the task and include dimensions or the equipment model. Add photos, video and a plan if available. We confirm the scope, specialist availability and quote before work begins.
One task or a whole list