GOODMAN · HOME SERVICES
Water pipes, pumps, tanks, controls and water treatment systems.
The minimum handyman visit is 200 ₾, including labour. Your selected handyman tasks count towards this amount. Cleaning and waste removal have their own tariffs, without this minimum.Starting labour rates exclude materials and equipment. We confirm the scope and agree the total before work begins.Emergency call-out in your area — from 350 GEL. Call-out and fault resolution. Materials are separate.Diagnostics use the catalog rates and count towards the handyman visit minimum.
Describe the task and include dimensions or the equipment model. Add photos, video and a plan if available. We confirm the scope, specialist availability and quote before work begins.
One task or a whole list
Indicative GOODMAN labour rate. One plastic line up to 32 mm along a prepared exposed route of 5 m or more; chasing and manifold separate. Labour only; materials and equipment excluded.
Indicative GOODMAN labour rate. One domestic pump station up to 1.5 kW on a prepared base and outlets; borehole and new routes separate. Labour only; materials and equipment excluded.
Indicative GOODMAN labour rate. One compact booster pump in an accessible prepared assembly; bypass and wiring separate. Labour only; materials and equipment excluded.
Indicative GOODMAN labour rate. Ground-level tank up to 500 L on a prepared base, up to 2 connections; lifting, base and pump separate. Labour only; materials and equipment excluded.
Indicative GOODMAN labour rate. Clean an accessible above-ground tank up to 500 L without entry; pumping, chemicals and laboratory testing separate. Labour only; materials and equipment excluded.
Indicative GOODMAN labour rate. Install one pressure vessel up to 100 L on ready connections and set pressure; pipe modifications separate. Labour only; materials and equipment excluded.
Indicative GOODMAN labour rate. Configure pressure relay and protection for one domestic pump; new panel and wiring separate. Labour only; materials and equipment excluded.
One main-line housing up to 1 inch on accessible pipe; bypass and assembly redesign separate. Labour only; materials and equipment excluded.
Indicative GOODMAN labour rate. Install a domestic under-sink RO unit up to 6 stages on ready connections; stone drilling separate. Labour only; materials and equipment excluded.
Indicative GOODMAN labour rate. One domestic UV module on an existing filtration line and socket; new electrical circuit separate. Labour only; materials and equipment excluded.
Indicative GOODMAN labour rate. One compact domestic softener on ready water, drain and power, including regeneration setup; water analysis and bypass separate. Labour only; materials and equipment excluded.
Indicative GOODMAN labour rate. Select and install a domestic assembly up to 3 modules using a supplied water report and ready connections; laboratory and building works separate. Labour only; materials and equipment excluded.
Inspect accessible plumbing to identify the cause of one leak. Opening walls, instrument-assisted hidden-leak detection and repairs are separate.
Tell us your preferred day or time window. A specialist's availability is confirmed when discussing your request.
Before you contact us
An initial estimate uses your tasks and quantities. Materials and any additional work are assessed from photos or on site. We agree the total before work begins.
Enter a preferred day or time window in your request. It is a preference, not a confirmed slot. We will agree on the visit after checking availability.
Describe the task and include dimensions or the equipment model. Add photos, video and a plan if available. We confirm the scope, specialist availability and quote before work begins.
One task or a whole list