48 services · 3 categoriesThe minimum handyman visit is 200 ₾, including labour. Your selected handyman tasks count towards this amount. Cleaning and waste removal have their own tariffs, without this minimum.Starting labour rates exclude materials and equipment. We confirm the scope and agree the total before work begins.Emergency call-out in your area — from 350 GEL. Call-out and fault resolution. Materials are separate.Diagnostics use the catalog rates and count towards the handyman visit minimum.
Services
Construction, equipment, cleaning and maintenance of pools and water features.
26 servicesIndicative GOODMAN labour rate. Per m² water surface, rectangular pool from 20 m²: shell layout, equipment placement and hydraulic design; geology and approvals extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² water surface, minimum 24 m², depth up to 1.5 m: shell, waterproofing, finish and basic system labour; excavation and design extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m³ of actual shell concrete: formwork, reinforcement and placing; minimum 10 m³, excavation and finishes extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One small supplied frame pool up to 4 m: assembly and basic connection on a prepared base; crane and shell welding extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² of actual lined shell surface: cutting and welding on a prepared base; minimum 40 m², levelling extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² shell surface: 2 waterproofing coats on a prepared base; minimum 40 m², crack repairs extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² shell surface: straight standard tile laying and grouting; minimum 40 m², mosaic patterns and levelling extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One domestic filtration set: fitting, up to 2 m pipework and commissioning; prepared connection points. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One domestic filter up to 100 kg media: unload, rinse, refill and start; media disposal extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One pool pump in an accessible plant area: compatible replacement and test; existing pipes and wiring ready. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One supplied heater or heat exchanger connected to prepared services and commissioned; new circuit extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One countercurrent kit in prepared fittings: pump, short pipework and test; shell alteration extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One supplied hydromassage group connected to existing jets and commissioned; shell alteration extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One low-voltage light in an existing niche and test; draining and new wiring extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One dosing unit, sensor calibration and trial run; prepared pipework, chemicals extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One supplied UV unit on a prepared bypass, connection and test; complex ozone system extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One visit for a pool up to 30 m³: testing, dose adjustment and filter backwash; chemicals and repeat visits extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² actual empty-shell surface: routine mechanical cleaning; minimum 30 m², draining and heavy deposits extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One routine visit to a private pool up to 30 m³: water, filter, skimmer and pump check; repairs extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Winterisation or startup of one pool up to 30 m³ per visit; chemicals, repairs and repeat cleaning extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Find and repair one leak in accessible pipework; shell testing, opening-up and underwater work extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Diagnosis and minor repair of one accessible unit, up to 2 hours; motor rewinding extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One supplied plunge tub on a prepared base: positioning and standard connection; lifting and stove extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One supplied hot tub: installation, connection to prepared services and test; moving and new circuit extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One small prefabricated fountain: supplied basin, pump, nozzle and startup; base and new electrical line extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² water surface of a simple lined pond from 10 m², depth up to 0.8 m: liner, edge and basic pump; excavation extra. Labour only; materials and installed equipment extra.
Steam-room construction and repair, finishes and specialist equipment.
12 servicesIndicative GOODMAN labour rate. Per m² sauna floor area from 6 m² in an existing room: insulation, lining, benches and basic equipment fitting; building shell extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² hammam floor area from 4 m² in an existing room: insulation, seating forms, simple mosaic and basic connections; structural shell extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One specialist-hour repairing agreed accessible elements, including fault assessment; major reconstruction measured separately. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² flat sauna wall or ceiling, lining on prepared battens; minimum 10 m², insulation extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² surface: thermal insulation and sealed vapour barrier in a prepared frame; minimum 10 m², lining extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per metre of simple single-level bench up to 60 cm deep: cutting, assembly and fixing; no sculpted design. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One supplied electric sauna heater at a prepared position and circuit; chimney and new circuit extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One supplied steam generator: mounting, short connections and startup; water, drain and power ready. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One supply/extract pair with duct up to 2 m through existing openings; drilling and controls extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One heat-resistant light on a prepared connection, including test; new wiring and power unit extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One supplied sauna door set in a prepared opening; opening enlargement extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² accessible wood: light cleaning and suitable protective treatment; minimum 10 m², deep sanding extra. Labour only; materials and installed equipment extra.
Stove and fireplace installation and finishes, chimneys and outdoor cooking hearths.
10 servicesIndicative GOODMAN labour rate. One simple fireplace to an existing design on a prepared base; chimney, decorative facing and design extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One supplied insert: position, connect to a compatible existing chimney and test; surround extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² simple heat-resistant facing on a prepared base; minimum 5 m², shaped details extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One supplied freestanding stove: fitting, existing-flue connection and test; masonry stove construction extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One fireplace and straight accessible flue up to 5 m; heavy creosote and specialist access extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per metre of modular metal flue with fixings through prepared penetrations; minimum 3 m, roof details extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per metre of liner in a straight accessible flue; minimum 3 m, masonry opening and blockage removal extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One accessible chimney joint: clean and seal; dismantling and work at height extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One supplied spark arrestor on an accessible chimney outlet; lift and chimney-cap alteration extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One simple brick barbecue to a supplied plan on a prepared base; canopy and worktop extra. Labour only; materials and installed equipment extra.