GOODMAN · HOME SERVICES
Irrigation, rainwater drainage and site flood control. Estimated after site details.
The minimum handyman visit is 200 ₾, including labour. Your selected handyman tasks count towards this amount. Cleaning and waste removal have their own tariffs, without this minimum.Starting labour rates exclude materials and equipment. We confirm the scope and agree the total before work begins.Emergency call-out in your area — from 350 GEL. Call-out and fault resolution. Materials are separate.Diagnostics use the catalog rates and count towards the handyman visit minimum.
Describe the task and include dimensions or the equipment model. Add photos, video and a plan if available. We confirm the scope, specialist availability and quote before work begins.
One task or a whole list
Indicative GOODMAN labour rate. Irrigation layout for a plot up to 200 m² and 4 zones, including flow sizing; survey and water-source design extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per m² irrigated lawn from 100 m²: shallow trenches, pipes, sprinklers and startup; water supply ready, pump station extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One accessible fault up to 2 hours, such as a joint or sprinkler; investigation under paving extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Startup or winterisation of a system up to 4 zones in one visit; compressor hire and repairs extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per metre of surface drip line with fixing and test; minimum 30 m, water feed extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One sprinkler on a prepared connection, including arc adjustment; minimum 2 units, trenching extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One controller up to 6 zones: connect existing wires, programme and test; new cable runs extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per metre of shallow drainage up to 0.5 m deep in ordinary soil, pipe laying and backfill; minimum 10 m, chamber and disposal extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per metre of French drain up to 0.5 m deep: trench, geotextile, pipe and gravel; minimum 10 m, outlet extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per metre of stormwater pipe up to 110 mm in a prepared sloping trench; minimum 10 m, excavation and chambers extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One supplied plastic chamber up to 1 m deep in a prepared pit: fitting and connections; concrete rings and excavation extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. Per metre of drainage channel on a prepared base, set to fall; minimum 5 m, paving removal extra. Labour only; materials and installed equipment extra.
Indicative GOODMAN labour rate. One compatible pump on existing pipes and power: replacement and startup; deeper well and new circuit extra. Labour only; materials and installed equipment extra.
Tell us your preferred day or time window. A specialist's availability is confirmed when discussing your request.
Before you contact us
An initial estimate uses your tasks and quantities. Materials and any additional work are assessed from photos or on site. We agree the total before work begins.
Enter a preferred day or time window in your request. It is a preference, not a confirmed slot. We will agree on the visit after checking availability.
Describe the task and include dimensions or the equipment model. Add photos, video and a plan if available. We confirm the scope, specialist availability and quote before work begins.
One task or a whole list